20R heads down track 1 and will be aligned to head down the Port Reading Secondary. |
Date:
1/17/2009 |
Location:
Bridgewater, NJ |
Views:
247 |
Collection Of:
Thom Horvath |
Locomotives: |
Author: Thom Horvath
|
|
Picture Categories: |
This picture is part of album: Lehigh Line scenes |