Unloading Rail at H.S.Crossing         
A few years back a general contractor rebuilt the crossing into the Ellsworth High School. The track approaches to the Xing were rebuilt in the process. The rail used in these approaches was of a different profile then the 85 lb rail used by the MEC. This rail just taken from the old siding will replace that rail and deaden the 1/8+ inch CLICK/CLACK to something the passengers will hardly notice.
Date: 7/25/2009 Location: Ellsworth, ME Views: 120 Collection Of:   David Larrabee
Author:  David Larrabee
Unloading Rail at H.S.Crossing
Picture Categories: RollingStock,Yard,Track,Action This picture is part of album:  Working on the Downeast Scenic RR
Share
User Comments No Comments on this picture
Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=1770623