The effect of power starvation on NS shortly into the CR split
SB ready to go, waiting for a NB to come up, then will follow the SB roadrailer due at location shortly.
Date:
9/1/1999
Location:
Macon, GA
Map
Views:
478
Collection Of:
G Gerard
Locomotives:
HATX 516(GP40-2)
HLCX 3679(GP38AC)
NS 3220(SD40-2)
HLCX 3676(GP38)
Author:
G Gerard
Picture Categories:
This picture is part of album:
NS Macon Terminal I
Share
User Comments
Contributor does not allow comments on their photos.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=5441521