CVSR M-3 waits for the siding switch to be lined and locked normal.  Contributor's Pick!       
Date: 10/17/2021 Location: Peninsula, OH   Map Show Peninsula on a rail map Views: 180 Collection Of:   Fred Stuckmann
Locomotives: CVSR M-3(RDC1)    Author:  Fred Stuckmann
CVSR M-3 waits for the siding switch to be lined and locked normal.
Picture Categories: Passenger,Action This picture is part of album:  3 trains in the Cuyahoga Valley today.
Share
User Comments Contributor does not allow comments on their photos.
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=5635509