Workers adjust the second pile into the jig to keep it vertical during driving. Note the first pile, fully driven to the left of this one; note also the pointed end, cut to allow for faster driving. |
Date:
9/6/2006 |
Location:
Plainfield, NJ Map |
Views:
300 |
Collection Of:
Dave Abeles |
|
Author: David Abeles
|
|
Picture Categories: |
This picture is part of album: So, you want to replace a railroad bridge... |