|
Title: |
Wyoming-Colorado (WYCO)- Encampment Div |
Description: |
WYCO had a separate division located over the Snowy Mountain range from their better-known line in Laramie. This line hauled mostly woodchips from Saratoga to the UP connection in Walcott. On this day they had Southwestern geep 2072 as power (both lines were owned by the same company, Western RR Builders). After years of hauling low volumes of low tariff traffic, they finally gave up and pulled the track. A siding at Walcott now serves transloading what came up the WYCO. |
Photo Date: |
6/29/1996 Upload Date: 7/20/2014 1:32:52 PM |
Location: |
Saratoga, WY |
Author: |
John Schumann |
Categories: |
|
Locomotives: |
SW 2072(GP7u) |
Views: |
451 Comments: 0 |
|
|
|
Title: |
Wyoming-Colorado (WYCO)-Encampment Div |
Description: |
This SW gkep was holding down the assignment on the WYCO branch to Saratoga. Both lines were owned by Western RR Builders. |
Photo Date: |
6/29/1996 Upload Date: 7/20/2014 1:54:23 PM |
Location: |
Saratoga, WY |
Author: |
John Schumann |
Categories: |
|
Locomotives: |
SW 2072(GP7u) |
Views: |
435 Comments: 0 |
|
|
|